Technical Specifications | ||
category | Parameters | S-20 |
Dimensions and Weight | Length × Width × Height (mm) | 5400×2770×2400 |
Total Machine Weight | 9.9T | |
Reference Drilling Depth Capability | Specification B | 2060m |
Specification N | 1690m | |
Specification H | 1310m | |
Specification P | 990m | |
Powertrain | engine | Cummins |
Rated Power | 164 kW | |
Rated Speed | 2000-2200rpm | |
Electrical System | 24V | |
Hydraulic System | Main Pump | 29MPa-242l/min |
Auxiliary Pump | 20 MPa-125l/min | |
Auxiliary Pump | 21.5MPa-50l/min | |
Hydraulic Oil Cooling | Air-cooled | |
Rotary Power Head | Power Head Type | Plunger Motor (Automatic Speed Control) |
Maximum Torque | 1500 Nm / 11000 Nm | |
Maximum Speed | 1300rpm | |
Main winch | Wire Rope Capacity | 27m/24# |
Increase pulling force | 100KN | |
Increase lifting speed | 44m/min | |
Auxiliary Hoist | Wire Rope Capacity | 1100m @ 8mm 1500m @ 6mm 1900m @ 5mm |
Increase pulling force | Empty Drum:13KN Full Drum:4KN | |
Increase lifting speed | Empty Drum:109m/min Full Drum:366m/min | |
Feed System | Feed Rate | Variable Speed Control |
| Feed Force | 60KN | |
| Lifting Force | 140KN | |
| Drilling Angle | 45-90 degrees | |
| Drill Pipe Length | 1.5m / 2m / 3m | |
Mud Pump | Type | Three-Cylinder Pistong High-Pressure Pump |
| Maximum Flow Rate | 250L/min | |
| Maximum Pressure | 9Mpa | |
| Product Manufacturing Process | Spray Painting | Whole-Unit Electrophoresis + KTL Powder Coating |
| Assembly | Standardization and Modularization | |
| Machining | Yamazaki Mazak | |
| Nitrogen Clamp | - | Standard |
ICAS Remote Intelligent Management and Operations Analysis System | - | Standard |